|
Built for Innovation
Power Infrastructure
Purpose-built for AI, robotics, and power-intensive R&D operations
5.3 MW POWER UPGRADE UNDERWAY
|
3,000 amp main switch gear available at 480/277V service.
|
Ownership has secured a 5.3 MW allocation from PG&E following submission of a power expansion application. A Preliminary Engineering Study (PES) has been executed, with design implementation underway. Upgrade includes new 21 kV primary service with primary-rated switchgear metering and step-down transformers.
|
The 21 kV electrical backbone is designed to support significant growth, with potential to scale up to ~20 MW. Future capacity via additional transformers and distribution infrastructure, subject to PG&E approvals.
|
key features
- Polished Concrete Floors
- Fiber-Optic Connectivity
- Modern HVAC with Building Management system
- Updated Restrooms with Showers
- Loading Dock Access
Floor Plans
Level 1: ±37,006 SF
Location
|
Direct Highway 237 frontage offers strong corporate branding potential and convenient access to I880, US101, and San Jose Airport.
|
NEARBY AMENTIES
DINING 1. Chick-Fil-A 2. Panera Bread 3. SAJJ Mediterranean 4. Starbucks 5. In-n-Out 6. Taco Bell 7. Shabuya RETAIL / LODGING 1. Target 2. CVS 3. Courtyard by Marriott 4. Walmart 5. Best Buy 6. Michaels 7. PetSmart 8. Dollar Tree WITHIN 5 MINUTE DRIVE 1. Levi’s Stadium 2. Top Golf |